National Power Supply Public Company Limited (NPS), part of Double A Group, has selected Andritz to supply a recovery boiler and evaporation plant for a new bioenergy power plant in Tha-Toom, Thailand. The systems will be installed at the pulp and paper mill of Double A Group to recover chemicals and generate renewable energy. The order value is in the high double-digit million euro range. It is included in Andritz’s order intake for the first quarter of 2026.
Valmet is to deliver a district heating optimization solution to Okun Energia Oy’s Miilu heat plant area in Outokumpu, Finland. The solution provides cost-effective, operator-independent control of district heating production and network operations. It also plays a mission-critical role in efficiently using waste heat from a local data center, improving energy management, and optimizing performance across its district heating network, which serves a municipality of 6,000 people in Eastern Finland.
Valmet will supply the complete Valmet DNAe Distributed Control System (DCS) and safety systems for PEC Gliwice Sp. z o.o.’s new waste-to-energy steam unit, part of the Green Energy Park project under construction in Gliwice, Poland. The order was placed by the EPC (Engineering, Procurement and Construction) consortium consisting of Mostostal Zabrze Gliwickie Przedsiebiorstwo Budownictwa Przemyslowego S.A., Oschatz Power GmbH, and Przedsiebiorstwo Remontów Ulic i Mostów S.A. (PRUiM).
Valmet is to deliver energy balance and district heating accumulator optimization solutions to Fortum’s energy production plants and assets in Espoo, Finland. The new solutions will be integrated with Fortum’s existing Valmet Distributed Control System (DCS), leveraging advanced automation and predictive energy management. The mission-critical solutions enhance the company’s flexible and reliable participation in electricity reserve markets while improving the cost efficiency of district heat production.